Today my coworker and I worked on the stuff related to RGV (rail guided vehicle). Since the chiller, and the reservoir hadn't arrived yet.
First, we needed to install the cages on the buffer stations, then we had to install the cages outside the RGV. We had to mix and match different sizes of cages in order for them to fit in between the machines. Next, we set the anchors down for the buffer stations, and the only thing they needed was to have the maintenance guys to drill holes to secure them down.
Also, the machine was ready for air, but we wouldn't be able to use it until we got the chiller. It seems like the chiller was the bottleneck of our installation.
No comments:
Post a Comment